Technical Specifications Library

WS 11-04 Hydraulic Testing of Distribution Network

WS 11-08 CONSTRUCTION OF POLYTHYTHYLENE (HDPE) NETWORK FOR THE FUTURE INSTALLATION OF FIBER-OPTIC CABLE

WS 11-10 DISTRIBUTION NETWORK (DP. 19bar)

WS 15-04 Arrangement of Storage Space for Steel Pipes

PEMP 02 Safety Management and Organisation Specifications

MS 10-01 Pipeline and Fittings Marking

MS 10-02 Polyethylene (HDPE) Pipeline Guide for Optical Fibre Cables

MS 10-03 Polyethylene Fittings for future installation of Fibre Optic Cables

MS 11-09 DISTRIBUTION NETWORK CABLE DELIVERY – RECEIVING STATION (DP 19 BAR)

MS 17-01 Insulating Connections of Distribution Network

PEMS 13-1 Rim for Polyethylene Pipes

PEMS 14-1 1/4 BRASS ROTARY BALL VALVES WITH

PEMS 15 1/4 BRASS ROTARY BALL VALVES WITH ONE BALL-CONICAL CONNECTOR AND ONE PLASTIC METAL FITTING

PEMS 18 EB- BALL-CONICAL CONNECTOR

EB-002 Special Aid Instructions for the Installation of a Station – Regulator-Meter Set for Gas Supply to the Consumer

MRWS 02-02 Installation of an Industrial MP Station with inlet pressure 19 – 6 BAR and construction of a drainage pipeline

MRMS 01-03 Metering Regulators (MP) for Industrial Consumers for feeding Cogeneration Units

MS 01-01 – Metering Gas Stations with Inlet Pressure 6-19 bar

MS 01-02 Pillar cabin

MRMS 01 03 Metering Regulators (MP) for Industrial Consumers for Supply to Cogeneration Units

MWS 01-01 Installation of Metering Station and Supply Pipeline

MS 04-01 Metering Stations with Inlet Pressure 1-4 bar

MWS 04-01 Installation of Metering Station and Supply Pipeline

ΕΠΑ-WS-001 Installation of 2 Pipelines in Single Beehive

ΕΔΑ-WS-002 Specification of excavation and rehabilitation activities

ΕΔΑ-WS-003 Specification of flushing and activation activities for networks with operating pressure of 4 bar

ΕΔΑ-WS-004 Specification of replacement works for displacement and modification of main pipelines

ΕΔΑ-WS-005 Specification of work for replacement of mains using the PE pipe insertion method (Dead mains insertion)

ΕΔΑ-WS-006 Specification of work for replacement of mains using the guided moling and horizontal directional drilling method

ΕΔΑ-WS-007 Specification of work for replacement of mains using the swagelining/close-fit method

ΕΔΑ-WS-008 Specification of work for sandblasting, application and repair of external coating of bituminous mastic on steel pipes, valves, bends and fittings

EΔΑ-WS-009 Emergency Incidents and preliminary measures to be taken by the contractors of EDA Attikis S.A.

ΕΔΑ-WS-010 Procedure for performing work in the vicinity of an installed gas network

EΔΑ-WS-011 Grounding of installations

ΕΔΑ-WS-012 Work specifications for the installation of drainage pipelines

ΕΔΑ-WS-013 Alternative procedure for performing pneumatic tests on PE main pipelines with MOP 4Bar

ΕΠΑ-WS-014 Specification of work for welding of copper drainage pipes

ΕΠΑ-WS-015 Procedure for strength – leakage test of the drainage pipe from the main pipe to the metering device

ΕΠΑ-WS-016 Gas take-off

ΕΠΑ WS-017 Installation of a fibre optic carrier pipeline in a single trench with a gas pipeline or in a dedicated trench

ΕΠΑ-WS-018 Guidelines for protection of main and PE pipelines and sewerage pipelines from tree roots

ΕΔΑ-WS-019 Permissible bending radius of PE pipelines

ΕΠΑ-WS-020 Required cooling time of PE fittings

ΕΔΑ-WS-021 WORK PROCEDURE FOR INSTALLING ADDITIONAL LOW PRESSURE METER

ΕΔΑ-WS-022 WORK PROCEDURE FOR INSTALLING RISER