Home » About Home » Ancillary Services

Ancillary Services

Enaon EDA, as the distribution network operator in the area of Attica, may provide to Distribution Users and/or Final Consumers, indicatively and not restrictively, the following services which are ancillary to the Core Activity and which are provided exclusively within its Licence Area.

Please read more about the service you are interested in:

Connection of new Delivery Points to the Distribution Network Cost of Service

(incl. VAT 24%)

Connection of a new Delivery Point means the connection of a natural gas installation of a Final Consumer to the Distribution Network. It is determined according to the respective tariff policy

the respective tariff policy

((see connection fees)

In order to apply, click on the button below.

Click here
This concerns the installation and maintenance of Smart Meter (intelligent metering system), at the request of a final consumer or end user.

Meter capacity Cost of Service*
(incl. VAT 24%)
G4 89,88 €
G6 99,68 €
G10 289,48 €
G16  289,48 €
G25 360,48 €
PTZ volume corrector with telemetry system 468,48 €

* Cost includes the estimated price of the smart metering system metering unit to be installed, per meter type
In order to apply, click on the button below.

Click here
Technical inspections of pressure measuring and regulating stations at Delivery Points

Cost of Service (incl.VAT 24%)

Technical inspections of pressure measuring and regulating stations of the Delivery Points, with an internal consumption network operating pressure ≤ 25mbar. The Operator shall carry out a technical inspection of pressure measuring and regulating stations at Delivery Points at the request of the End User or the Final Consumer. Charge ad  hoc
Technical inspections of pressure measuring and regulation stations at Delivery Points with an internal consumption network operating pressure > 25 mbar per consumption point. The Operator shall carry out a technical inspection of pressure measuring and regulating stations at Delivery Points at the request of the End User or the Final Consumer. Charge ad hoc

In order to apply, click on the button below.

Click here
Meter capacity Cost of Service*
(incl. VAT 24%)
G4 89,88 €
G6 99,68 €
G10 289,48 €
G16  289,48 €
G25 360,48 €
PTZ volume corrector with telemetry system 468,48 €

* Cost includes the estimated price of the smart metering system metering unit to be installed, per meter type
In order to apply, click on the button below.

Click here
Relocation of part of the existing Distribution Network Cost of Service (incl. VAT 24%)
Charge ad hoc

In order to apply, click on the button below.

Click here
Modification of the External Installation and/or the meter Cost of Service (incl. VAT 24%)
Charge ad hoc

In order to apply, click on the button below.

Click here
Deactivation Cost Cost of Service
(incl. VAT 24%)
Meter G4 to G40 (Deactivation following a request of the Distribution User upon request of the End Consumer) 23,92 €
Meter >G40 (Deactivation following a request of the Distribution User upon request of the End Consumer) 32,51 €
Meter G4 to G40 (Deactivation following a request of the Distribution User) 24,24 €
Meter >G40 (Deactivation following a request of the Distribution User) 32,84 €
Meter G4 to G40 (Deactivation on the Initiative of enaon EDA) 28,81 €
Meter >G40 (Deactivation on the Initiative of enaon EDA) 37,40  €

In order to apply, click on the button below.

Click here
Reactivation Cost Cost of Service
(incl. VAT 24%)
Meter G4 to G40 (Reactivation following a request of the Distribution User upon request of the End Consumer) 25,48 €
Meter >G40 (Reactivation following a request of the Distribution User upon request of the End Consumer) 34,08 €
Meter G4 to G40 (Reactivation following a request of the Distribution User) 25,48 €
Meter >G40 (Reactivation following a request of the Distribution User) 34,08 €
Meter G4 to G40 (Reactivation following cut-off on the Initiative of enaon EDA) 25,48 €
Meter >G40 (Reactivation following cut-off on the Initiative of enaon EDA) 34,08 €

In order to apply, click on the button below.

Click here
Disconnection Cost Cost of Service
(incl. VAT 24%)
• Sealing of the valve before the reducer

• Sealing of the valve before the reducer and removal of the reducer

43,53 €

 

Shutting off the Buried GRM Valve 43,18 €

Also, if during the execution of Disconnection of the Supply with Intervention in the External Installation the Modification of the External Installation is required, the service in question will be charged on a case-by-case (ad hoc) basis

In order to apply, click on the button below.

Click here
Reconnection Cost Cost of Service
(incl. VAT 24%)
•Reconnection following disconnection through valve sealing before the reducer
•Reconnection following disconnection through valve sealing before the reducer and reducer removal

35,22 €

 

Reconnection opening the Buried GRM Valve 34,87 €

In order to apply, click on the button below.

Click here
Inspection of existing Internal Installations following the cut-off of the supply and/or disconnection, for safety reasons Cost of Service
(incl. VAT 24%)
Free of charge

In order to apply, click on the button below.

Click here
The activity may be carried out at the request of the final consumer or End user and concerns the carrying out of a check on the correct recording of the volume of gas passing through. The company will replace the meter and send it to special calibration laboratories. In case the meter is found not to be working according to the specifications, the cost of the calibration will be assumed by EDA Attikis S.A., otherwise the calibration service will be charged to the applicant.

Conventional Meter Type Cost of Service
(incl. VAT 24%)
G4 48,48 €
G6  48,48 €
G10 85,48 €
G16 125,48 €
G25 125,48 €
G40 125,48 €
G65 (Diaph) 134,08 €
G65 (T/R) 234,08 €
G100 (T) 244,08 €
G100 (R) 259,08 €
G160 284,08 €
G250 334,08 €
G400 384,08 €
G650 434,08 €
G1000 584,08 €
G1600 693,84 €
G2500 2.062,88 €
Smart Meter Type Cost of Service
(incl. VAT 24%)
G4 245,48 €
G6  255,48 €
G10 265,48 €
G16 275,48 €
G25 345,48 €

In order to apply, click on the button below.

Click here
Recording of measurements at the request of the Final Consumer or End User with a frequency deviating from that specified by the Operator. Cost of Service (incl. VAT 24%)
Inspection of the meter in order to record the indication of the volume of Natural Gas supplied to the consumer. Free of charge

In order to apply, click on the button below.

Click here
Provision of information about potential future supply regarding a connection application that has been temporarily rejected Cost of Service
(incl. VAT 24%)
Free of charge

In order to apply, click on the button below.

Click here
Issuance of a Fire Safety Certificate Cost of Service (incl. VAT 24%)
Certificate of Occupancy for the Fire Department regarding the new gas uses of the commercial space. This certificate is necessary for the issuance of a license to operate the business premises. Free of charge

In order to apply, click on the button below.

Click here
Change – Modification of Connection Agreement Cost of Service (incl. VAT 24%)
For any modification of the data included in the relevant Connection Agreement. Free of charge

In order to apply, click on the button below.

Click here

Request the service you are interested in

Please fill in the form below with your details and the ancillary service you wish to apply for:

    Auxiliary Service*:

    *All fields marked with an asterisk must be prerequisites. If any of the fields are not filled in, the request cannot be submitted.