Gas connection process
The first task involves connecting your property to the gas network and comprises the construction of the drainage system (i.e. digging the road, connecting the drainage pipe underground to the main gas pipeline and running the drainage pipe to the point where the regulator is installed), the installation of the regulator, if required, and the installation of the gas meter.
These activities are carried out by Enaon EDA and the consumer is required to pay the corresponding connection fees, the amount of which depends on the type of connection
Connection fees for new delivery points (approved by R.A.A.E.Y)
Connection Type | Nominal connection fees (excluding VAT) | Rate of discount (1) | Connection fees paid (excluding VAT | |||
---|---|---|---|---|---|---|
Penetration up to 25% | Penetration up to 75% | Penetration up to 25% | Penetration up to 75% | |||
New Connection (1st meter is included) | 1.251,98 € | 100% | 60% | 0 € | 500,79 € | |
New Connection Riser in vertical line (1st meter is included) | 3.669,65 € | 100% | 60% | 0€ | 1.467,86 € | |
Additional meter in New connection/ Riser Connection | 171,84 € | 100% | 60% | 0 € | 68,74 € | |
Additional Riser meter in existing Connection | 352,10 € | 100% | 60% | 0 € | 140,84 € | |
Additional Riser meter in existing Connection | 365,47 € | 100% | 60% | 0 € | 146,19 € | |
FOR CONSUMERS WITH A MAXIMUM FLOW RATE GREATER THEAN 65 Nm3/h & PRESSURE OVER 25mbar | CONNECTION FEE IS CALCULATED PER CASE (AD HOC) |
Discount is given in case of early activation (gas-on) of internal installation (within 3 months from the construction of delivery point).
Click here to be informed for the current offers on the Connection Fees of the new delivery points
Municipalities by penetration category and discount rate
Penetration up to 25% – Discount up to 100% | |||
ASPROPYRGOS | DIONISOS | ELEFSINA | KERATSINI-DRAPETSONA |
KROPIA | MANDRAS-EIDYLLIAS | PAIANIA | PERAMA |
Penetration from 25% to 75% – Discount up to 60% | |||
AGIA VARVARA | AGIA PARASKEVI | AGIOS DIMITRIOS | AGIOI ANARGYROI – KAMATERO |
ATHENS | EGALEO | ALIMOS | AMAROUSSION |
ACHARNES | VARI-VOULA-VOULIAGMENI | VRILISSIA | VYRONAS |
GALATSI | GLYFADA | DAFNI – IMITTOS | HELLINIKON – ARGYROUPOLI |
ZOGRAFOU | ILIOUPOLI | HERAKLEIO | KAISARIANΙ |
KALLITHEA | KIFISIA | KORYDALLOS | LYKOVRYSI – PEFKI |
METAMORFOSI | MOSCHATO – TAVROS | NEA IONIA | NEA SMYRNI |
NEA PHILADELPHIA – NEA HALKIDONA | NEA LIOSIA (ILION) | NIKAIA – AGIOS IOANNIS RENTIS | PALAIO FALIRO |
PALLINI | PAPAGOU – CHOLARGOS | PIRAEUS | PENTELI |
PERISTERI | PETROUPOLI | FILOTHEI – PSYCHIKO | FYLI (ANO LIOSIA) |
CHAIDARI | CHALANDRI | ||
Penetration above 75% – 0% discount | |||
There are no municipalities with a penetration rate exceeding 75% |
Construction of the internal installation
The second task concerns the construction of the internal gas installation, which includes the piping, fittings and devices from the gas meter to the gas combustion devices and the flue gas exhaust outlet.
The construction of the internal installation and the installation of the gas appliances shall be performed by licensed gas plumbers of the consumer’s choice. The cost of internal installation depends on the type of connection (centralized or stand-alone) and the condition and specifics of your existing installation and property.
In all cases, please request an economic quotation for the cost of your internal installation and appliances from at least 2 different installers of your choice.