Invoices
By virtue of RAEWW Decision no.E-14/2024 and for the regulatory period 2023-26, the tariff coefficients of the Basic Distribution Activity per category of End Customers of the distribution networks of Enaon EDA, were determined as follows:
2023 Distribution Tariff Coefficients | |||
---|---|---|---|
Customer Category | Capacity Charge (€/KWh/h) | Energy Charge (€/KWh) | Penetration Surcharge (€/KWh) |
Distribution Network of East Macedonia & Thrace | |||
Residential | 1,1968137 | 0,0203594 | 0,0009226 |
Commercial | 1,2028876 | 0,0114071 | 0,0009226 |
Industrial | 7,5849184 | 0,0007034 | 0,0000738 |
Distribution Network of West Greece | |||
Residential | 0,9258748 | 0,0171124 | 0,0009226 |
Commercial | 0,8631966 | 0,0113198 | 0,0009226 |
Industrial | 5,5664403 | 0,0007831 | 0,0000738 |
Distribution Network of West Macedonia | |||
Residential | 1,0091045 | 0,0139792 | 0,0009226 |
Commercial | 0,9201247 | 0,0178704 | 0,0009226 |
Industrial | 4,5550732 | 0,0010899 | 0,0000738 |
Distribution Network of Epirus | |||
Residential | 1,1046658 | 0,0155717 | 0,0009226 |
Commercial | 1,1193131 | 0,0143825 | 0,0009226 |
Industrial | 4,7645954 | 0,0008975 | 0,0000738 |
Distribution Network of Central Macedonia | |||
Residential | 1,1793667 | 0,0181842 | 0,0009226 |
Commercial | 1,1725776 | 0,0129582 | 0,0009226 |
Industrial | 6,4674142 | 0,0005456 | 0,0000738 |
Distribution Network of Peloponnese | |||
Residential | 0,7168535 | 0,0144767 | 0,0009226 |
Commercial | 0,6906291 | 0,0164576 | 0,0009226 |
Industrial | 6,5038938 | 0,0006386 | 0,0000738 |
Distribution Network of Central Greece | |||
Residential | 1,2877901 | 0,0160793 | 0,0009226 |
Commercial | 1,3028075 | 0,0137638 | 0,0009226 |
Industrial | 7,1175776 | 0,0005875 | 0,0000738 |
Distribution Network of Thessaloniki | |||
General (Residential-Commercial) | 0,5214502 | 0,0109082 | 0,0009226 |
Industrial | 2,0868542 | 0,0001671 | 0,0000738 |
CNG | 0,0000000 | 0,0009277 | 0,0000895 |
Distribution Network of Thessaly | |||
General (Residential-Commercial) | 0,7510809 | 0,0132900 | 0,0009226 |
Industrial | 3,0037975 | 0,0002636 | 0,0000738 |
CNG | 0,0000000 | 0,0021754 | 0,0000895 |
Distribution Network of Attica | |||
General (Residential-Commercial) | 1,0918789 | 0,0135620 | 0,0009226 |
Cooling-Cogeneration | 1,0881634 | 0,0037395 | 0,0001874 |
Industrial | 4,3819584 | 0,0003362 | 0,0000738 |
Based on the provisions of article 16 of the Tariff Regulation, the above coefficients were adjusted with the latest available percentage change in the average annual Consumer Price Index (CPI), as published by the Greek Statistical Authority for the month of December 2023. For the year 2023, ΔCPIt-1 was set at 3.5 %.
Based on this value, from February 1st, 2024 to November 30th,2024 the following rates applied:
Distribution Tariff Coefficients (01/02/2024-30/11/2024) | |||
---|---|---|---|
Category | Capacity Charge (€/KWh/h) | Energy Charge (€/KWh) | Penetration Surcharge (€/KWh) |
Distribution Network of East Macedonia & Thrace | |||
Residential | 1,2387022 | 0,0210720 | 0,0009549 |
Commercial | 1,2449887 | 0,0118063 | 0,0009549 |
Industrial | 7,8503905 | 0,0007280 | 0,0000764 |
Distribution Network of West Greece | |||
Residential | 0,9582804 | 0,0177113 | 0,0009549 |
Commercial | 0,8934085 | 0,0117160 | 0,0009549 |
Industrial | 5,7612657 | 0,0008105 | 0,0000764 |
Distribution Network of West Macedonia | |||
Residential | 1,0444232 | 0,0144685 | 0,0009549 |
Commercial | 0,9523291 | 0,0184959 | 0,0009549 |
Industrial | 4,7145008 | 0,0011280 | 0,0000764 |
Distribution Network of Epirus | |||
Residential | 1,1433291 | 0,0161167 | 0,0009549 |
Commercial | 1,1584891 | 0,0148859 | 0,0009549 |
Industrial | 4,9313562 | 0,0009289 | 0,0000764 |
Distribution Network of Central Macedonia | |||
Residential | 1,2206445 | 0,0188206 | 0,0009549 |
Commercial | 1,2136178 | 0,0134117 | 0,0009549 |
Industrial | 6,6937737 | 0,0005647 | 0,0000764 |
Distribution Network of Peloponnese | |||
Residential | 0,7419434 | 0,0149834 | 0,0009549 |
Commercial | 0,7148011 | 0,0170336 | 0,0009549 |
Industrial | 6,7315301 | 0,0006610 | 0,0000764 |
Distribution Network of Central Greece | |||
Residential | 1,3328628 | 0,0166421 | 0,0009549 |
Commercial | 1,3484058 | 0,0142455 | 0,0009549 |
Industrial | 7,3666928 | 0,0006081 | 0,0000764 |
Distribution Network of Thessaloniki | |||
General (Residential-Commercial) | 0,5397010 | 0,0112900 | 0,0009549 |
Industrial | 2,1598941 | 0,0001729 | 0,0000764 |
CNG | 0,0000000 | 0,0009602 | 0,0000926 |
Distribution Network of Thessaly | |||
General (Residential- Commercial) | 0,7773687 | 0,0137552 | 0,0009549 |
Industrial | 3,1089304 | 0,0002728 | 0,0000764 |
CNG | 0,0000000 | 0,0022515 | 0,0000926 |
Distribution Network of Attica | |||
General (Residential- Commercial) | 1,1300947 | 0,0140367 | 0,0009549 |
Cooling -Cogeneration | 1,1262491 | 0,0038704 | 0,0001940 |
Industrial | 4,5353269 | 0,0003480 | 0,0000764 |
By virtue of RAEWW Dec.no E-257/2024, the tariff coefficients of the Basic Distribution Activity for the regulatory period 2023-2026 were revised. Effective from 1.12.2024 to 31.12.2024, the coefficients are as follows:
Distribution Tariff Coefficients for non-Industrial Customers (01/12/24-31/12/24) | |||
---|---|---|---|
Category | Capacity Charge (€/kWh/h) | Energy Charge (€/kWh) | Penetration Surcharge (€/kWh) |
General (Residential-Commercial) | 0,8903294 | 0,0143155 | 0,0009549 |
Cooling -Cogeneration (Attica Network) | 4,5362667 | 0,0009659 | 0,0001940 |
CNG (Thessaloniki-Thessaly networks) | 0,0000000 | 0,0012629 | 0,0000926 |
Distribution Tariff Coefficients for Industrial Customers (01/12/24-31/12/24) | |||
---|---|---|---|
Distribution Network | Capacity Charge (€/kWh/h) | Energy Charge (€/kWh) | Penetration Surcharge (€/kWh) |
Attica | 4,6260335 | 0,0003549 | 0,0000764 |
Thessaloniki | 2,2030921 | 0,0001764 | 0,0000764 |
Thessaly | 3,1711090 | 0,0002783 | 0,0000764 |
East Macedonia & Thrace | 6,1972623 | 0,0007396 | 0,0000764 |
Central Macedonia | 6,8276492 | 0,0005760 | 0,0000764 |
Central Greece | 7,5140266 | 0,0006202 | 0,0000764 |
West Greece | 6,1972623 | 0,0007396 | 0,0000764 |
West Macedonia | 6,1972623 | 0,0007396 | 0,0000764 |
Epirus | 6,1972623 | 0,0007396 | 0,0000764 |
Peloponnese | 6,8661607 | 0,0006742 | 0,0000764 |
Based on the provisions of article 16 of the Tariff Regulation, the above coefficients are adjusted with the latest available percentage change in the average annual Consumer Price Index (CPI), as published by the Greek Statistical Authority for the month of December 2024. For the year 2024, ΔCPIt-1 was set at 2,8 %.
Based on this value, from January 1st, 2025 the following rates are applied:
2025 Distribution Tariff Coefficients for non-Industrial Customers | |||
---|---|---|---|
Category | Capacity Charge (€/kWh/h) | Energy Charge (€/kWh) | Penetration Surcharge (€/kWh) |
General (Residential-Commercial) | 0,9152586 | 0,0147163 | 0,0009816 |
Cooling -Cogeneration (Attica Network) | 4,6632822 | 0,0009929 | 0,0001994 |
CNG (Thessaloniki-Thessaly networks) | 0,0000000 | 0,0012983 | 0,0000952 |
2025 Distribution Tariff Coefficients for Industrial Customers | |||
---|---|---|---|
Distribution Network | Capacity Charge (€/kWh/h) | Energy Charge (€/kWh) | Penetration Surcharge (€/kWh) |
Attica | 4,7555624 | 0,0003648 | 0,0000785 |
Thessaloniki | 2,2647787 | 0,0001813 | 0,0000785 |
Thessaly | 3,2599001 | 0,0002861 | 0,0000785 |
East Macedonia & Thrace | 6,3707856 | 0,0007603 | 0,0000785 |
Central Macedonia | 7,0188234 | 0,0005921 | 0,0000785 |
Central Greece | 7,7244193 | 0,0006376 | 0,0000785 |
West Greece | 6,3707856 | 0,0007603 | 0,0000785 |
West Macedonia | 6,3707856 | 0,0007603 | 0,0000785 |
Epirus | 6,3707856 | 0,0007603 | 0,0000785 |
Peloponnese | 7,0584132 | 0,0006931 | 0,0000785 |
The Distribution Tariffs are applied in accordance with Articles 17 and 18 of the Tariff Regulation in €/kWh for the Energy Charge and the Penetration Surcharge and in €/kWh/h for the Capacity Charge, as provided in the Distribution Networks Operation Code.
Connection fees for new delivery points
Type of connection | Nominal connection fees (excluding VAT) | Rate of discount (1) | Connection fees paid (excluding VAT | ||||
---|---|---|---|---|---|---|---|
Penetration up to 25% | Penetration up to 75% | Penetration up to 25% | Penetration up to 75% | ||||
Central heating (new supply) (2) | 900 € | 100% | 70% | 0 € | 270€ | ||
Domestic use without heating (new supply) (2) | 660€ | 100% | 70% | 0€ | 198€ | ||
Domestic use with heating (new supply) (2) | 660€ | 100% | 70% | 0 € | 198€ | ||
Central heating or Domestic use with or without heating (additional meter in existing supply) (2) | 250€ | 100% | 70% | 0 € | 75€ | ||
Commercial or industrial use (<100 m3/h) (new supply) | 870€ | 100% | 70% | 0 € | 261€ | ||
Air conditioning or cogeneration (domestic or commercial) (new supply) (2) | 870€ | 100% | 70% | 0 € | 261€ | ||
Commercial or industrial use (<100 m3/h) (additional meter to existing supply) (2) | 250€ | 100% | 70% | 0 € | 75€ | ||
2nd supply on the same property (where an additional meter can be added to the 1st supply) (2) | 1.300€ | 50% | 50% | 650 € | 650€ | ||
(2) Valid for overground or underground network inside property line up to 6m (excluding risers) | |||||||
(additional cost, excluding risers) |
6 – 12 m | 250€ | 100% | 70% | 0€ | 75€ | |
>12 m | 500€ | 100% | 70% | 0€ | 150€ | ||
Commercial or industrial use (network pressure over 25mbar) | Connection fees are set after technical assessment |
(1) Discount is given in case of early activation (gas-on) of internal installation (within 3 months from the construction of delivery point).
The discount rate is differentiated based on the penetration rate of each municipality.
(3) Connection fee for overground or underground network inside property line over 6m is charged in addition to the service line connection fee.
RISER (domestic use with heating) |
Nominal connection fees per meter (excluding VAT) |
Rate of discount (1) | Connection fees paid per meter (excluding VAT) |
|||
---|---|---|---|---|---|---|
Number of meters per column | Penetration up to 25% | Penetration up to 75% | Penetration up to 25% | Penetration up to 75% | ||
1 meter | 1.600€ | 50% | 50% | 800€ | 800€ | |
2-3 meters (simultaneous placement) | 800€ | 62,5% | 62,5% | 300€ | 300€ | |
4+ meters (simultaneous installation) | 500€ | 100% | 70% | 0€ | 150€ | |
Additional meter (on existing lifting column) | 250€ | 100% | 70% | 0€ | 75€ |
(1) Discount is given in case of early activation (gas-on) of internal installation (within 3 months from the construction of delivery point).
Discount rate is differentiated based on the penetration rate of each municipality.
Municipalities by penetration category and discount rate
Penetration up to 25% – Discount up to 100% | |||
ASPROPYRGOS | DIONISOS | ELEFSINA | KERATSINI-DRAPETSONA |
KROPIA | MANDRAS-EIDYLLIAS | PAIANIA | PERAMA |
Penetration from 25% to 75% – Discount up to 70% | |||
AGIA VARVARA | AGIA PARASKEVI | AGIOS DIMITRIOS | AGIOI ANARGYROI – KAMATERO |
ATHENS | EGALEO | ALIMOS | AMAROUSSION |
ACHARNES | VARI-VOULA-VOULIAGMENI | VRILISSIA | VYRONAS |
GALATSI | GLYFADA | DAFNI – IMITTOS | HELLINIKON – ARGYROUPOLI |
ZOGRAFOU | ILIOUPOLI | HERAKLEIO | KAISARIANΙ |
KALLITHEA | KIFISIA | KORYDALLOS | LYKOVRYSI – PEFKI |
METAMORFOSI | MOSCHATO – TAVROS | NEA IONIA | NEA SMYRNI |
NEA PHILADELPHIA – NEA HALKIDONA | NEA LIOSIA (ILION) | NIKAIA – AGIOS IOANNIS RENTIS | PALAIO FALIRO |
PALLINI | PAPAGOU – CHOLARGOS | PIRAEUS | PENTELI |
PERISTERI | PETROUPOLI | FILOTHEI – PSYCHIKO | FYLI (ANO LIOSIA) |
CHAIDARI | CHALANDRI | ||
Penetration above 75% – 0% discount | |||
There are no municipalities with a penetration rate exceeding 75% |
Based on the Tariff Regulation for Basic Distribution Activity (GG B’ 3358/30.06.2022), the Capacity Factor refers to €/(kWh GCV/hour).
Where required for the conversion of the installed capacity, the following Gross Calorific Value is used: 11,4935 €/(kWh GCV/hr).