By virtue of RAEWW Decision no.E-14/2024 and for the regulatory period 2023-26, the tariff coefficients of the Basic Distribution Activity per category of End Customers of the distribution networks of Enaon EDA, were determined as follows:

 

2023 Distribution Tariff Coefficients
Customer Category Capacity Charge (€/KWh/h) Energy Charge (€/KWh) Penetration Surcharge (€/KWh)
Distribution Network of East Macedonia & Thrace
Residential 1,1968137 0,0203594 0,0009226
Commercial 1,2028876 0,0114071 0,0009226
Industrial 7,5849184 0,0007034 0,0000738
Distribution Network of West Greece
Residential 0,9258748 0,0171124 0,0009226
Commercial 0,8631966 0,0113198 0,0009226
Industrial 5,5664403 0,0007831 0,0000738
Distribution Network of West Macedonia
Residential 1,0091045 0,0139792 0,0009226
Commercial 0,9201247 0,0178704 0,0009226
Industrial 4,5550732 0,0010899 0,0000738
Distribution Network of Epirus
Residential 1,1046658 0,0155717 0,0009226
Commercial 1,1193131 0,0143825 0,0009226
Industrial 4,7645954 0,0008975 0,0000738
Distribution Network of Central Macedonia
Residential 1,1793667 0,0181842 0,0009226
Commercial 1,1725776 0,0129582 0,0009226
Industrial 6,4674142 0,0005456 0,0000738
Distribution Network of Peloponnese
Residential 0,7168535 0,0144767 0,0009226
Commercial 0,6906291 0,0164576 0,0009226
Industrial 6,5038938 0,0006386 0,0000738
Distribution Network of Central Greece
Residential 1,2877901 0,0160793 0,0009226
Commercial 1,3028075 0,0137638 0,0009226
Industrial 7,1175776 0,0005875 0,0000738
Distribution Network of Thessaloniki
General (Residential-Commercial) 0,5214502 0,0109082 0,0009226
Industrial 2,0868542 0,0001671 0,0000738
CNG 0,0000000 0,0009277 0,0000895
Distribution Network of Thessaly
General (Residential-Commercial) 0,7510809 0,0132900 0,0009226
Industrial 3,0037975 0,0002636 0,0000738
CNG 0,0000000 0,0021754 0,0000895
Distribution Network of Attica
General (Residential-Commercial) 1,0918789 0,0135620 0,0009226
Cooling-Cogeneration 1,0881634 0,0037395 0,0001874
Industrial 4,3819584 0,0003362 0,0000738

 

Based on the provisions of article 16 of the Tariff Regulation, the above coefficients were adjusted with the latest available percentage change in the average annual Consumer Price Index (CPI), as published by the Greek Statistical Authority for the month of December 2023. For the year 2023, ΔCPIt-1 was set at 3.5 %.

Based on this value, from February 1st, 2024 to November 30th,2024 the following rates applied:

 

 

Distribution Tariff Coefficients (01/02/2024-30/11/2024)
Category Capacity Charge (€/KWh/h) Energy Charge (€/KWh) Penetration Surcharge (€/KWh)
Distribution Network of East Macedonia & Thrace
Residential 1,2387022 0,0210720 0,0009549
Commercial 1,2449887 0,0118063 0,0009549
Industrial 7,8503905 0,0007280 0,0000764
Distribution Network of West Greece
Residential 0,9582804 0,0177113 0,0009549
Commercial 0,8934085 0,0117160 0,0009549
Industrial 5,7612657 0,0008105 0,0000764
Distribution Network of West Macedonia
Residential 1,0444232 0,0144685 0,0009549
Commercial 0,9523291 0,0184959 0,0009549
Industrial 4,7145008 0,0011280 0,0000764
Distribution Network of Epirus
Residential 1,1433291 0,0161167 0,0009549
Commercial 1,1584891 0,0148859 0,0009549
Industrial 4,9313562 0,0009289 0,0000764
Distribution Network of Central Macedonia
Residential 1,2206445 0,0188206 0,0009549
Commercial 1,2136178 0,0134117 0,0009549
Industrial 6,6937737 0,0005647 0,0000764
Distribution Network of Peloponnese
Residential 0,7419434 0,0149834 0,0009549
Commercial 0,7148011 0,0170336 0,0009549
Industrial 6,7315301 0,0006610 0,0000764
Distribution Network of Central Greece
Residential 1,3328628 0,0166421 0,0009549
Commercial 1,3484058 0,0142455 0,0009549
Industrial 7,3666928 0,0006081 0,0000764
Distribution Network of Thessaloniki
General (Residential-Commercial) 0,5397010 0,0112900 0,0009549
Industrial 2,1598941 0,0001729 0,0000764
CNG 0,0000000 0,0009602 0,0000926
Distribution Network of Thessaly
General (Residential- Commercial) 0,7773687 0,0137552 0,0009549
Industrial 3,1089304 0,0002728 0,0000764
CNG 0,0000000 0,0022515 0,0000926
Distribution Network of Attica
General (Residential- Commercial) 1,1300947 0,0140367 0,0009549
Cooling -Cogeneration 1,1262491 0,0038704 0,0001940
Industrial 4,5353269 0,0003480 0,0000764

 

By virtue of RAEWW Dec.no E-257/2024, the tariff coefficients of the Basic Distribution Activity for the regulatory period 2023-2026 were revised. Effective from 1.12.2024 to 31.12.2024, the coefficients are as follows:

 

Distribution Tariff Coefficients for non-Industrial Customers (01/12/24-31/12/24)
Category Capacity Charge (€/kWh/h) Energy Charge (€/kWh) Penetration Surcharge (€/kWh)
General (Residential-Commercial) 0,8903294 0,0143155 0,0009549
Cooling -Cogeneration (Attica Network) 4,5362667 0,0009659 0,0001940
CNG (Thessaloniki-Thessaly networks) 0,0000000 0,0012629 0,0000926

 

Distribution Tariff Coefficients for Industrial Customers (01/12/24-31/12/24)
Distribution Network Capacity Charge (€/kWh/h) Energy Charge (€/kWh) Penetration Surcharge (€/kWh)
Attica 4,6260335 0,0003549 0,0000764
Thessaloniki 2,2030921 0,0001764 0,0000764
Thessaly 3,1711090 0,0002783 0,0000764
East Macedonia & Thrace 6,1972623 0,0007396 0,0000764
Central Macedonia 6,8276492 0,0005760 0,0000764
Central Greece 7,5140266 0,0006202 0,0000764
West Greece 6,1972623 0,0007396 0,0000764
West Macedonia 6,1972623 0,0007396 0,0000764
Epirus 6,1972623 0,0007396 0,0000764
Peloponnese 6,8661607 0,0006742 0,0000764

 

Based on the provisions of article 16 of the Tariff Regulation, the above coefficients are adjusted with the latest available percentage change in the average annual Consumer Price Index (CPI), as published by the Greek Statistical Authority for the month of December 2024. For the year 2024, ΔCPIt-1 was set at 2,8 %.

Based on this value, from January 1st, 2025 the following rates are applied:

 

2025 Distribution Tariff Coefficients for non-Industrial Customers
Category Capacity Charge (€/kWh/h) Energy Charge (€/kWh) Penetration Surcharge (€/kWh)
General (Residential-Commercial) 0,9152586 0,0147163 0,0009816
Cooling -Cogeneration (Attica Network) 4,6632822 0,0009929 0,0001994
CNG (Thessaloniki-Thessaly networks) 0,0000000 0,0012983 0,0000952

 

2025 Distribution Tariff Coefficients for Industrial Customers
Distribution Network Capacity Charge (€/kWh/h) Energy Charge (€/kWh) Penetration Surcharge (€/kWh)
Attica 4,7555624 0,0003648 0,0000785
Thessaloniki 2,2647787 0,0001813 0,0000785
Thessaly 3,2599001 0,0002861 0,0000785
East Macedonia & Thrace 6,3707856 0,0007603 0,0000785
Central Macedonia 7,0188234 0,0005921 0,0000785
Central Greece 7,7244193 0,0006376 0,0000785
West Greece 6,3707856 0,0007603 0,0000785
West Macedonia 6,3707856 0,0007603 0,0000785
Epirus 6,3707856 0,0007603 0,0000785
Peloponnese 7,0584132 0,0006931 0,0000785

 

The Distribution Tariffs are applied in accordance with Articles 17 and 18 of the Tariff Regulation in €/kWh for the Energy Charge and the Penetration Surcharge and in €/kWh/h for the Capacity Charge, as provided in the Distribution Networks Operation Code.

Connection fees for new delivery points

Type of connection Nominal connection fees (excluding VAT) Rate of discount (1) Connection fees paid (excluding VAT
Penetration up to 25% Penetration up to 75% Penetration up to 25% Penetration up to 75%
Central heating (new supply) (2) 900 € 100% 70% 0 € 270€
Domestic use without heating (new supply) (2) 660€ 100% 70% 0€ 198€
Domestic use with heating (new supply) (2) 660€ 100% 70% 0 € 198€
Central heating or Domestic use with or without heating (additional meter in existing supply) (2) 250€ 100% 70% 0 € 75€
Commercial or industrial use (<100 m3/h) (new supply) 870€ 100% 70% 0 € 261€
Air conditioning or cogeneration (domestic or commercial) (new supply) (2) 870€ 100% 70% 0 € 261€
Commercial or industrial use (<100 m3/h) (additional meter to existing supply) (2) 250€ 100% 70% 0 € 75€
2nd supply on the same property (where an additional meter can be added to the 1st supply) (2) 1.300€ 50% 50% 650 € 650€
(2) Valid for overground or underground network inside property line up to 6m (excluding risers)
Cases with overground or underground network inside property line over than 6m (3)

(additional cost, excluding risers)

6 – 12 m 250€ 100% 70% 0€ 75€
>12 m 500€ 100% 70% 0€ 150€
Commercial or industrial use (network pressure over 25mbar) Connection fees are set after technical assessment

(1) Discount is given in case of early activation (gas-on) of internal installation (within 3 months from the construction of delivery point).

The discount rate is differentiated based on the penetration rate of each municipality.

(3) Connection fee for overground or underground network inside property line over 6m is charged in addition to the service line connection fee.

RISER
(domestic use with heating)
Nominal connection fees per meter
(excluding VAT)
Rate of discount (1) Connection fees paid per meter
(excluding VAT)
Number of meters per column Penetration up to 25% Penetration up to 75% Penetration up to 25% Penetration up to 75%
1 meter 1.600€ 50% 50% 800€ 800€
2-3 meters (simultaneous placement) 800€ 62,5% 62,5% 300€ 300€
4+ meters (simultaneous installation) 500€ 100% 70% 0€ 150€
Additional meter (on existing lifting column) 250€ 100% 70% 0€ 75€

(1) Discount is given in case of early activation (gas-on) of internal installation (within 3 months from the construction of delivery point).
Discount rate is differentiated based on the penetration rate of each municipality.

 

Municipalities by penetration category and discount rate

Penetration up to 25% – Discount up to 100%
ASPROPYRGOS DIONISOS ELEFSINA KERATSINI-DRAPETSONA
KROPIA MANDRAS-EIDYLLIAS PAIANIA PERAMA
Penetration from 25% to 75% – Discount up to 70%
AGIA VARVARA AGIA PARASKEVI AGIOS DIMITRIOS AGIOI ANARGYROI – KAMATERO
ATHENS EGALEO ALIMOS AMAROUSSION
ACHARNES VARI-VOULA-VOULIAGMENI VRILISSIA VYRONAS
GALATSI GLYFADA DAFNI – IMITTOS HELLINIKON – ARGYROUPOLI
ZOGRAFOU ILIOUPOLI HERAKLEIO KAISARIANΙ
KALLITHEA KIFISIA KORYDALLOS LYKOVRYSI – PEFKI
METAMORFOSI MOSCHATO – TAVROS NEA IONIA NEA SMYRNI
NEA PHILADELPHIA – NEA HALKIDONA NEA LIOSIA (ILION) NIKAIA – AGIOS IOANNIS RENTIS PALAIO FALIRO
PALLINI PAPAGOU – CHOLARGOS PIRAEUS PENTELI
PERISTERI PETROUPOLI FILOTHEI – PSYCHIKO FYLI (ANO LIOSIA)
CHAIDARI CHALANDRI
Penetration above 75% – 0% discount
There are no municipalities with a penetration rate exceeding 75%

Based on the Tariff Regulation for Basic Distribution Activity (GG B’ 3358/30.06.2022), the Capacity Factor refers to €/(kWh GCV/hour).

Where required for the conversion of the installed capacity, the following Gross Calorific Value is used: 11,4935 €/(kWh GCV/hr).