Construction of delivery point
Upon the signature of the connection contract agreement, Enaon EDA proceeds with the construction of the delivery point at your property.
Initially, if required, a specialized crew will construct the gas supply pipeline, which connects the gas network with your building, and install the gas regulator to provide pressure regulation for domestic use. The gas meter for measuring this consumption is placed at a pre-agreed location with Enaon EDA, which will meet the requirements of technical specifications and easy access.
The location of the delivery point shall be carefully determined to ensure that all the individual apartments in a block of flats can be connected and not just a part of them. In the case that a property has already an active natural gas supply the new delivery point shall be placed in a position close to the existing one. Typical location for the construction of the delivery point is on the property’s boundary line or upon request and agreement with Enaon EDA inside the boundary line and/or at the height of the apartment balconies using a riser connection.
Case of G4 and G6 capacity meters
In the case of G4 and G6 capacity meters, Enaon EDA will initially install a support accessory/console called “Mensola” at the specified connection point for the construction of the delivery point.
Each “Mensola” will have a label displaying the customer’s HKASP (Identification Number of Delivery Point). Once the support console (Mensola) is installed, the construction of the delivery point is considered complete, and a relevant electronic notification will be sent to the customer.
The installation of the measuring device will take place in a subsequent stage during the activation of the internal installation by the competent personnel of Enaon EDA.
Case of meters with a capacity greater than G6
In cases of meters with a capacity greater than G6, the support console (Mensola) will not be used. The construction of the delivery point is a complete process with the installation of the meters.
Depending on the consumer category, the connection type and the meter location, consumers are charged the relevant connection fees