Home » For BUSINESS » Ancillary Services

Ancillary Services

Enaon EDA, as the distribution network operator in the area of Attica, may provide to Distribution Users and/or Final Consumers, indicatively and not restrictively, the following services which are ancillary to the Core Activity and which are provided exclusively within its Licence Area.

Please read more about the service you are interested in:

Connection of new Delivery Points to the Distribution Network

 

Cost of Service

(incl. VAT 24%)

Connection of a new Delivery Point means the connection of a natural gas installation of a Final Consumer to the Distribution Network.

 

It is determined according to the respective tariff policy

the respective tariff policy

((see connection fees)

In order to apply, click on the button below.

Click here

This concerns the installation and maintenance of Smart Meter (intelligent metering system), at the request of a final consumer or end user.

Meter capacity Cost of Service*

(incl. VAT 24%)

G4 179,25 €
G6 232,57 €
G10 478,09 €
G16 490,49 €
G25 602,09 €

* Cost includes the estimated price of the smart metering system metering unit to be installed, per meter type

In order to apply, click on the button below.

Click here
Technical inspections of pressure measuring and regulating stations at Delivery Points Cost of Service

(incl. VAT 24%)

Technical inspections of pressure measuring and regulating stations of the Delivery Points, with an internal consumption network operating pressure ≤ 25mbar. The Operator shall carry out a technical inspection of pressure measuring and regulating stations at Delivery Points at the request of the End User or the Final Consumer. 35,81 
Technical inspections of pressure measuring and regulation stations at Delivery Points with an internal consumption network operating pressure > 25 mbar per consumption point. The Operator shall carry out a technical inspection of pressure measuring and regulating stations at Delivery Points at the request of the End User or the Final Consumer. 73,93 €

In order to apply, click on the button below.

Click here
Installation of telemetry equipment Cost of Service

(incl. VAT 24%)

Installation of a telemetering device on the gas meter in order to remotely monitor the reading of the mechanical meter. Installation cost 63,16 €. The cost of the work includes the cost of the telemetry device to be installed.

In order to apply, click on the button below.

Click here

Costs are calculated on a specific case by case basis considering the required modifications, material & labor needs.

In order to apply, click on the button below.

Click here
Modification of the External Installation and/or the meter Cost of Service

(incl. VAT 24%)

Damaged Meter Replacement

In case the meter has been damaged due to the consumer’s fault, a replacement request must be made. The company will remove the old meter and install a new one.

The cost is calculated on a case-by-case basis, taking into account the materials and labor used.
Increase/decrease in load

The consumer declares the increase or decrease of the originally declared load (due to addition or removal of appliances, change of gas use, etc.). Depending on the magnitude of the load increase or decrease, and if required, the Company shall replace the old meter with a new meter suitable to serve the new requested load.

The pre-test rate is: 43,90 €.

Costs for service will be determined once the assessment has been carried out.

In any case, the consumer will be additionally charged with the material costs calculated on a case-by-case basis.

Relocation of Meter and/or Drainpipe

Refers to work where at the request of a consumer or end user, the location of the meter or part or all of the External Installation is relocated.

The charge for the pre-inspection (assessment) is 43,90 €.

The cost for the meter or supply displacement service will be calculated after the assessment:

In any case, the consumer will be additionally charged with the material costs calculated on a case-by-case basis.

Replacement of ballast

This refers to the work where, at the request of a consumer or end user, the existing meter ballast is replaced with a new one, due to deterioration or damage to the old one.

The charge for the pre-inspection (assessment) is 37,27 €.

The cost of the ballast replacement service will be calculated after the assessment.

In order to apply, click on the button below.

Click here
Disconnection of the Final Consumer by interference with the External Installation. Cost of Service

(incl. VAT 24%)

Meter disconnection at the request of an Final Consumer or End User

It concerns the deactivation of the meter or the Pressure and Metering Control Station by placing a seal on the flow switch (tap) of the meter inlet. Upon power cut-off operation, the Operator performs the final consumption recording and deactivation of the meter.

35,27 €

In order to apply, click on the button below.

Click here
Reactivation of a final consumer Cost of Service

(incl. VAT 24%)

Reactivation of the external installation section (Regulator – Meter)

It concerns the control of the internal installation and the re-supply of the Final Consumer with a consumption internal network operating pressure ≤ 25mbar, at the request of the end user, without additional technical work.

40,22
Reactivation of the external installation part (Pressure & Metering Station)

It concerns the control of the internal installation and the re-supply of the Final Consumer with an internal consumption network operating pressure> 25mbar, at the request of the end user, without additional technical work.

150,45 €

In order to apply, click on the button below.

Click here
Dismantling or deactivation of part or whole of the External Installation Cost of Service

(incl. VAT 24%)

Removal of Meter Installation

Service which involves the removal of the gas meter from the supply pipe (external installation). Upon completion of the work, the Operator shall carry out the final consumption recording, deactivate the meter and perform the necessary work for its dismantling.

37,51 
Disassembly of Supply

a) Disconnection of the distribution pipeline, i.e., the part of the pipework from the main pipeline to the gas meter for installations with an internal consumption network operating pressure ≤ 25 mbar, including their fittings. During the dismantling operation, the Operator shall carry out the final consumption recording and the deactivation of the meter (if any) and shall carry out the necessary work for the dismantling of part or all of the external installation.

b) Disconnection of the supply pipe, i.e. the part of the pipework from the main pipe and the metering device for installations with an internal consumption network operating pressure > 25 mbar. During the dismantling operation, the operator shall carry out the final consumption survey and perform the work necessary for dismantling part or all of the external installation.

The charge for the pre-inspection is 43.90 €.

The cost shall be calculated on a case-by-case basis, taking into account the materials and labor to be used.

In order to apply, click on the button below.

Click here
Final consumer reconnection with intervention in the external installation Cost of Service

(incl. VAT 24%)

Reconnection of part of the external installation

It refers to the control of the internal installation and the re-supply of the Final Consumer by intervening in the external installation, based on the request of the End User or Final Consumer.

Costs are calculated on a case-by-case basis, taking into account the approved tariff policy.

In order to apply, click on the button below.

Click here
Checking existing Internal Installations upon power failure and/or disconnection, for safety reasons. Cost of Service

(incl. VAT 24%)

It relates to the work where, at the request of a consumer or end user, for safety reasons, an inspection of internal installations is carried out as provided for by the technical regulations for internal installations (Government Gazette 236/28.03.97, B’/15.07.03 & Government Gazette 976/28.03.12), as they are in force. 34,10 € In order to apply, click on the button below. 38,61 €

In order to apply, click on the button below.

Click here

The activity may be carried out at the request of the final consumer or End user and concerns the carrying out of a check on the correct recording of the volume of gas passing through. The company will replace the meter and send it to special calibration laboratories. In case the meter is found not to be working according to the specifications, the cost of the calibration will be assumed by EDA Attikis S.A., otherwise the calibration service will be charged to the applicant.

Meter capacity Cost of Service

(incl. VAT 24%)

G2,5 -G4 109,81 €
G6 109,81 €
G10 221,41 €
G16 221,41 €
G25 339,21 €
G40 401,21 €
G65 401,21 €
G100 587,21 €
G160 649,21 €
G250 773,21 €
G400 897,21 €
G650 1.021,21 €

In order to apply, click on the button below.

Click here
Recording of measurements at the request of the Final Consumer or End User with a frequency deviating from that specified by the Operator. Cost of Service

(incl. VAT 24%)

Inspection of the meter in order to record the indication of the volume of Natural Gas supplied to the consumer. Free of charge

 

In order to apply, click on the button below.

Click here

Providing data for a connection request is provided free of charge. In order to submit a request, click on the button below.

In order to apply, click on the button below.

Click here
Issuance of a Fire Safety Certificate

 

Cost of Service

(incl. VAT 24%)

Certificate of Occupancy for the Fire Department regarding the new gas uses of the commercial space. This certificate is necessary for the issuance of a license to operate the business premises. Free of charge

 

In order to apply, click on the button below.

Click here
Change – Modification of Connection Agreement Cost of Service

(incl. VAT 24%)

For any modification of the data included in the relevant Connection Agreement. Free of charge

 

In order to apply, click on the button below.

Click here

Request the service you are interested in

Please fill in the form below with your details and the ancillary service you wish to apply for: